If you’re planning to build a house on a 30×40 site in Bangalore or Mysore, the cost of construction can vary depending on several factors such as the quality of materials used, the type of foundation, the number of floors, and the overall design of the house. Here’s a rough estimate of the cost of constructing a 30×40 ground floor house:
- Foundation and Structure
The foundation and structure of the house are the most critical components of any building. The cost of constructing the foundation can range from Rs. 500 to Rs. 1000 per square foot, depending on the type of foundation. The most common types of foundation used for houses are strip foundation, raft foundation, and pile foundation.
The cost of constructing the structure of the house can range from Rs. 800 to Rs. 1500 per square foot, depending on the quality of materials used. The most commonly used materials for construction are bricks, cement blocks, and fly ash blocks.
- Roofing
The cost of constructing the roof can vary depending on the type of roofing material used. The most commonly used materials for roofing are tiles, metal sheets, and concrete slabs. The cost of roofing can range from Rs. 100 to Rs. 300 per square foot.
- Electrical and Plumbing
The cost of electrical and plumbing work can range from Rs. 50 to Rs. 100 per square foot. The cost can vary depending on the type of fixtures used and the complexity of the work.
- Flooring and Finishing
The cost of flooring and finishing work can range from Rs. 200 to Rs. 500 per square foot, depending on the type of flooring material used. The most commonly used flooring materials are ceramic tiles, granite, and marble.
- Miscellaneous
Other miscellaneous costs include labor charges, architect fees, permits, and taxes. These costs can range from Rs. 200 to Rs. 500 per square foot.
Based on the above estimates, the cost of constructing a 30×40 ground floor house in Bangalore or Mysore can range from Rs. 25 lakhs to Rs. 30 lakhs. However, it is important to note that these are only rough estimates, and the actual cost may vary depending on the specific requirements of your house. It is always recommended to consult with a professional architect or contractor to get a more accurate estimate of the construction cost.
The below table will show you the approximate cost of building/house construction cost in Bangalore (construction cost in Mysore may increase by 20%)
Note: it will not include borewell interior govt charges compound drain sump etc based on site condition and locality prices will changes, only for the rough calculation considered 15-20% extra cost
bigger site dimensions square feet rates/price may reduce because higher the slab area construction cost will reduce 30×50, 30×60, 40×40, 40×50, 40×60, 50×40, 50×80, etc. cost